Barrier fluid system pressurized by a bladder accumulator supplying clean liquid for an arrangement 3 pressurized dual seal.
A Cooler
B Bladder accumulator
C Drain
D Vent
4 Flush (F)
5 Liquid barrier OUT (LBO)
6 Liquid barrier IN (LBI)
7 Seal chamber
Example seal: EagleBurgmann H75A4-T dual pusher mechanical seal.
Key
1 Make-up barrier liquid
2 Bladder accumulator
3 Bladder charge connection
8 Vent
9 Barrier fluid drain
10 Valve* (for checking accumulator bladder integrity)
PI Pressure indicator*
PIT Pressure transmitter with local indicator
TI Temperature indicator**
TIT Temperature transmitter local indicator
* If specified, both the PI and valve 10 shall be installed for checking bladder integrity.
** If specified.
*** Vertically oriented, finned air cooler shall be installed if specified
3CW-FB, 3CW-BB, 3CW-FF
Follow the direct link to your API 682 4th ed. contact
Download the free EagleBurgmann API piping plan tool and benefit from useful and practical information